Building Permit Information
BUILDING PERMITS ARE REQUIRED
IN GENERAL TO ERECT, INSTALL, EXTEND, CHANGE THE USE OF, ALTER OR REPAIR A BUILDING. A BUILDING IS DEFINED AS A STRUCTURE OCCUPYING AN AREA GREATER THAN 10 SQUARE METERS (107 SQUARE FEET).
The following are examples of projects which would require building permits:
construct a new home
add a carport, garage, or rooms to an existing home
install new rooms in the attic
any structural work
add dormers
enclose a porch - roof over a sundeck
repairs or renovations
raise the house to provide a full basement or first storey
excavate the basement to provide a full basement
add structural features such as decks, balconies, canopies etc
accessory buildings such as garage, tool shed, playhouse, etc.
(separate from the house) (see our staff re: allowable size)
retaining wall - in excess of 1 metre in height
install a swimming pool
install chimney, wood stove, fireplace
BUILDING PERMITS NOT REQUIRED
When you do non-structural work such as:
painting
landscaping, sidewalks, driveways
kitchen cupboards
eaves trough
erect a fence other than swimming pool enclosure fence
BUILDING PERMITS REQUIRED
North Bay - Mattawa Conservation Authority or Ministry of Environment & Energy Septic Approval
M.T.O./District/Municipal Entrance Permit
M.T.O. Land Use Permit
Hydro Permit
Ministry of Natural Resources Working on Water Permit
DFO - FHM (fish habitat review)
Township Entrance Permit
OTHER DEPARTMENTS AND JURISDICTIONS
YOU MAY NEED APPROVAL/UNDERGROUND LOCATIONS OR PERMITS FROM:
Committee of Adjustment - minor variance
- land severance
Planning Department - rezoning
- development control
Bell Canada - underground telephone locations
Ontario Hydro - underground hydro locations
WHY THERE ARE BY-LAWS & CODES
By-laws and codes ensure that development meets health, fire, structural, and general safety requirements for the protection of the individual as well as the community as a whole. By-laws and codes also ensure a better standard of growth and development of the municipalities.
CONSTRUCTION WITHOUT A PERMIT
NO CONSTRUCTION, ALTERATION, ERECTION, INSTALLATION, REPAIR, OR CHANGE OF USE SHALL OCCUR UNTIL A BUILDING PERMIT IS APPLIED FOR AND ISSUED. STARTING CONSTRUCTION WITHOUT A PERMIT IS ILLEGAL AND AN OFFENCE UNDER THE ONTARIO BUILDING CODE ACT.
CHANGES/VARIATIONS FROM THE REVIEWED PLANS MUST BE SUBMITTED FOR REVIEW PRIOR TO INITIATION OF THE CHANGES.
CONTACTS FOR FURTHER INFORMATION
|
Reg Moore, Chief Building Official |
North-Bay Mattawa Conservation Authority |
|
Kevin Murphy, Road Superintendent |
Ministry of Natural Resources |
|
Department of Fisheries & Oceans |
Ministry of Transportation |
|
Electrical Safety Authority |
PO Box 69, 701 Highway 124
McKellar, Ontario P0G 1C0
Phone: (705) 389-2842 Fax: (705) 389-1244
Hours: Monday - Friday 8:30am - 4:30pm